trystinn: (ducklings)
[personal profile] trystinn
Done:
Finish single roof panel on the new chicken pen
Install roofing over Freckles' pen in the West Wing of Bunhalla
Pump out duck pond and replace with clean water (ewww)
Nail up fencing top rails in the West Wing (externals only)

Next week:
Nail up side and front rails for Freckles' pen
Nail up fencing top rails in the East Wing
Design and install center gate in Bunhalla
Hose down shed coop
Buy paint, then re-paint shed coop

To be scheduled in the future (off the top of my head):
Re-fence interior, center fencing in Bunhalla (both wings)
Build pen north and west of shed coop
re-paint front porch
re-paint south porch
re-paint doors
finish painting kitchen cupboards
get wall finished between living room and kitchen
repaint new wall

Profile

trystinn: (Default)
TrystInn

October 2012

S M T W T F S
 123 456
789 10 111213
1415 16 17 181920
2122 2324252627
28293031   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 29th, 2026 06:06 am
Powered by Dreamwidth Studios